Run an OPF with the active power constrained to their set points 
(PMIN=PMAX=desired PG) on all but the slack bus. This will minimize the slack 
bus generator cost, which minimizes the slack bus generation, i.e. minimizes 
system losses, all by optimizing the reactive power generation and voltage 
profile.

    Ray


> On Nov 1, 2021, at 8:12 AM, 2254878263 <jh...@qq.com> wrote:
> 
> Hi all
> How to use Matpower to model reactive power planning?
> Thank you very much.
> 



Reply via email to