Currently I have the following double checking work
assigned:
8217767 D* 64 1539456 24.1 10.9 70.9 28-Jun-03 12:17 07-Jun-03 13:00 DougF 498 v19/v20 9301753 D 64 1.2 10.9 60.9 30-Jun-03 13:38 30-Jun-03 10:15 UBuild3 1794 v19/v20 9694667 D 65 4566464 11.2 1.9 60.9 30-Jun-03 13:38 20-Jun-03 10:24 UBuild3 1794 v19/v20 9697967 D 64 10.8 33.9 75.9 28-Jun-03 12:17 20-Jun-03 19:44 DougF 498 v19/v20 9708187 D 64 424832 9.0 5.0 62.0 01-Jul-03 14:34 22-Jun-03 15:54 UBuild2 1794 v19/v20 9726763 D 64 6.2 5.9 60.9 30-Jun-03 13:38 25-Jun-03 11:31 UBuild3 1794 v19/v20 9739237 D 64 3.4 10.0 62.0 01-Jul-03 14:34 28-Jun-03 05:14 UBuild2 1794 v19/v20 What does the star after the "D" mean on
the first one of these?
Doug.
|