MARS ODYSSEY THEMIS IMAGES July 15-19, 2013 o THEMIS Art #116 (15 July 2013) http://themis.asu.edu/node/6204
o THEMIS Art #117 (16 July 2013) http://themis.asu.edu/node/6205 o THEMIS Art #118 (17 July 2013) http://themis.asu.edu/node/6206 o THEMIS Art #119 (18 July 2013) http://themis.asu.edu/node/6207 o THEMIS Art #120 (19 July 2013) http://themis.asu.edu/node/6208 All of the THEMIS images are archived here: http://themis.asu.edu/latest.html NASA's Jet Propulsion Laboratory manages the 2001 Mars Odyssey mission for NASA's Office of Space Science, Washington, D.C. The Thermal Emission Imaging System (THEMIS) was developed by Arizona State University, Tempe, in co.oration with Raytheon Santa Barbara Remote Sensing. The THEMIS investigation is led by Dr. Philip Christensen at Arizona State University. Lockheed Martin Astronautics, Denver, is the prime contractor for the Odyssey project, and developed and built the orbiter. Mission operations are conducted jointly from Lockheed Martin and from JPL, a division of the California Institute of Technology in Pasadena. ______________________________________________ Visit the Archives at http://www.meteorite-list-archives.com Meteorite-list mailing list Meteorite-list@meteoritecentral.com http://six.pairlist.net/mailman/listinfo/meteorite-list