Revision: planner-muse--mwolson--1.0--patch-57
Archive: [EMAIL PROTECTED]
Creator: Michael Olson <[EMAIL PROTECTED]>
Date: Fri Aug 26 10:00:59 EST 2005
Standard-date: 2005-08-26 15:00:59 GMT
Modified-files: ChangeLog.mwolson ChangeLog.yh
planner-appt.el planner-el.texi planner.el
New-patches: [EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
[EMAIL PROTECTED]
Summary: Merged from [EMAIL PROTECTED] (patch 42-43), [EMAIL PROTECTED] (patch
14-19), [EMAIL PROTECTED] (patch 471-474)
Keywords: merge
Patches applied:
* [EMAIL PROTECTED]
Merged from [EMAIL PROTECTED] (patch 34-56), [EMAIL PROTECTED] (patch
452-470), [EMAIL PROTECTED] (patch 0-10)
* [EMAIL PROTECTED]
Merged from [EMAIL PROTECTED] (patch 14-19), [EMAIL PROTECTED] (patch
471-474)
* [EMAIL PROTECTED]
Catch up with Sacha. Fix typ-o.
* [EMAIL PROTECTED]
Catch up with Sacha.
* [EMAIL PROTECTED]
Change name of node and menu item from Changing Tasks to Modifying tasks,
since Changing Tasks has other meanings in the context of workflow and
timeclock. Add some helpful related index entries.
* [EMAIL PROTECTED]
Corrected installation instructions for registering and pulling from the tla
emacs-wiki archive. We were still saying 2004, should be 2005.
* [EMAIL PROTECTED]
Fixed pxref in <tasks> node. Fleshed out and added cindex entries around it.
* [EMAIL PROTECTED]
Get the mwolson archive address right, for real.
* [EMAIL PROTECTED]
Bugfix: with-planner: Defer evaluation of planner-derived-mode-p
* [EMAIL PROTECTED]
Bugfix: with-planner-update-setup: Save current window point as well
* [EMAIL PROTECTED]
Catch up with [EMAIL PROTECTED]
* [EMAIL PROTECTED]
Bugfix: planner-appt-mark-calendar shouldn't call
planner-appt-filename-to-date