Hi,
    I have configured a master slave ring architecture. Can anyone suggest
me how to load test this architecture ?
    I am using three MySQL servers in the following fashion :
    A  -->  B  -->  C  -->  A
where A is the Master to B, B is the Master to C and C is the Master to A.
    My aim is to distribute the database load equally on the three MySQL
servers. Please suggest me some way to do it.

    Thanks

    Akash Agarwal
    Senior Member Technical Staff,
    Intersolutions Pvt Ltd,
    NOIDA, INDIA
    (www.lotusinterworks.com)
    (www.alacre.com)


---------------------------------------------------------------------
Before posting, please check:
   http://www.mysql.com/manual.php   (the manual)
   http://lists.mysql.com/           (the list archive)

To request this thread, e-mail <[EMAIL PROTECTED]>
To unsubscribe, e-mail <[EMAIL PROTECTED]>
Trouble unsubscribing? Try: http://lists.mysql.com/php/unsubscribe.php

Reply via email to