Hi, I have exact the same experiences with timeperiod exclusion. It does not work in the moment or we have had not understand the corresponding part in the nagios documentation?! ;-)
> I had defined a timeperiod of "ProdSLA" which was 24x7, then an > exclusion timeperiod called "ProdMaint", which was 0300-0500 daily, > then added that as an excluded time period for ProdSLA. This was used > for checks, not notifications. As the start of the excluded time > period would be reached, it'd stop checking, as designed, but never > resuming checking at 0500. I'll have to see if I can dig out the > config files from CVS. It was a 3.x install. ------------------------------------------------------------------------- This SF.Net email is sponsored by the Moblin Your Move Developer's challenge Build the coolest Linux based applications with Moblin SDK & win great prizes Grand prize is a trip for two to an Open Source event anywhere in the world http://moblin-contest.org/redirect.php?banner_id=100&url=/ _______________________________________________ Nagios-users mailing list Nagios-users@lists.sourceforge.net https://lists.sourceforge.net/lists/listinfo/nagios-users ::: Please include Nagios version, plugin version (-v) and OS when reporting any issue. ::: Messages without supporting info will risk being sent to /dev/null