On Thu, 17 Feb 2011, Santino Codispoti wrote:

Is it possible to order a ISDN BRI line from the LEC and have them
look at the design of a DS1 and have them if possible design the ISDN
BRI lineon a devurse path or at lest different equipment within the
CO?

I suspect that, particularly for something as small (in terms of revenue to the LEC) as a BRI circuit, you won't have much leverage to ask for anything 'off the menu', like diverse physical routing through the CO.

When you get to the point of dealing with the copper in the ground/on the pole, your options for route diversity are usually extremely limited (read: nonexistent). Telco copper plant is usually based on large multipair cables from the CO on a specific route, so even if you managed to get them to commit to diverse routeing in the CO, the copper pairs will still be in the same cable bundle, entering your building and the CO at the same points.

jms

Reply via email to