[ https://issues.apache.org/jira/browse/ACCUMULO-2535?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Eric Newton updated ACCUMULO-2535: ---------------------------------- Summary: large cluster failed to shutdown cleanly (was: large cluster failed to shutdown cleanlin) > large cluster failed to shutdown cleanly > ---------------------------------------- > > Key: ACCUMULO-2535 > URL: https://issues.apache.org/jira/browse/ACCUMULO-2535 > Project: Accumulo > Issue Type: Bug > Components: tserver > Affects Versions: 1.4.4 > Environment: large cluster > Reporter: Eric Newton > > A large 1.4.4 cluster failed to shutdown cleanly. It was stuck trying to > unload 7 non-root !METADATA tablets. Master was sending "unload tablet" > messages constantly, but the tserver refused to unload the tablets. > Examining the tserver logs of one server, it began a full major compaction, > then received the unload message, and finished the compaction. The tablet > was never unloaded. > The cluster had ~400 metadata tablets overall. > System recovered after a hard shutdown of the remaining 8 servers (7 metadata > table servers and 1 root tablet server). -- This message was sent by Atlassian JIRA (v6.2#6252)