Hi,
let's say I have a couple of sequences that shall all run through the same
nodesetup and then get written to a new location.
What is your typical setup for this?
At the moment we do it with linked switches, but if you want to send stuff to
the renderfarm, you have to save a scene for every switch setting.
I was wondering if Nuke is aware of which write node is active, and have the
Read-node load the footage accordingly.
Basically:
if Write1: all [SHOT] tokens in all Read-filepaths get replaced with "sh001"
(you define that stuff in a text node, or it is the Write-name, or whatever)
if Write2: all [SHOT] tokens in all Read-filepaths get replaced with "sh002"
and so on...
(manually set a default while you are working and no write is active)
Would that be possible somehow? (Maybe there is a much better solution that I
don't know about?)
cheers,
Thomas
_______________________________________________
Nuke-users mailing list
[email protected], http://forums.thefoundry.co.uk/
http://support.thefoundry.co.uk/cgi-bin/mailman/listinfo/nuke-users