[ 
https://issues.apache.org/jira/browse/OAK-5605?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Marcel Reutegger resolved OAK-5605.
-----------------------------------
       Resolution: Fixed
    Fix Version/s: 1.7.0

Each phase now checks whether it should cancel and tests are enabled: 
http://svn.apache.org/r1782968

> Speed up time to cancel revision GC
> -----------------------------------
>
>                 Key: OAK-5605
>                 URL: https://issues.apache.org/jira/browse/OAK-5605
>             Project: Jackrabbit Oak
>          Issue Type: Improvement
>          Components: core, documentmk
>            Reporter: Marcel Reutegger
>            Assignee: Marcel Reutegger
>            Priority: Minor
>             Fix For: 1.7.0, 1.8
>
>
> OAK-4915 introduced a method to cancel the Revision GC on a 
> DocumentNodeStore. The implementation does not wait for the Revision GC to 
> stop, but simply sets a flag. In some cases the Revision GC still runs for 
> some time even when canceled. This issue is about reducing the time it takes 
> to actually cancel the Revision GC.



--
This message was sent by Atlassian JIRA
(v6.3.15#6346)

Reply via email to