[ 
https://issues.apache.org/jira/browse/OAK-5970?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16101645#comment-16101645
 ] 

Thomas Mueller commented on OAK-5970:
-------------------------------------

[~chetanm], with reindexing using oak-run, what is the current plan / state? I 
think JMX is not needed in this case.

> (Re-)Indexing: estimate progress / ETA
> --------------------------------------
>
>                 Key: OAK-5970
>                 URL: https://issues.apache.org/jira/browse/OAK-5970
>             Project: Jackrabbit Oak
>          Issue Type: New Feature
>          Components: indexing
>            Reporter: Thomas Mueller
>            Assignee: Chetan Mehrotra
>             Fix For: 1.8
>
>
> Reindexing can take a long time, so it would be good if we can estimate where 
> we are at (for example in percent of the relevant number of nodes). It might 
> also be possible to estimate when indexing will be done, and the current path.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Reply via email to