[ https://issues.apache.org/jira/browse/OAK-5360?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Davide Giannella updated OAK-5360: ---------------------------------- Fix Version/s: (was: 1.7.9) 1.7.10 > Cancellation of gc should be reflected by RevisionGC.getRevisionGCStatus() > -------------------------------------------------------------------------- > > Key: OAK-5360 > URL: https://issues.apache.org/jira/browse/OAK-5360 > Project: Jackrabbit Oak > Issue Type: Improvement > Components: core, segment-tar > Reporter: Michael Dürig > Assignee: Andrei Dulceanu > Labels: gc, management, monitoring, production > Fix For: 1.8, 1.7.10 > > > Currently when a garbage collection cycle is cancelled from "within" (i.e. > through {{CancelCompactionSupplier}} then this is not reflected through > {{RevisionGC.getRevisionGCStatus()}} but rather reported as successful run. > We should change this and return a failure result indication the cancellation > so downstream consumers get an proper indication whether and which gc runs > actually succeeded. -- This message was sent by Atlassian JIRA (v6.4.14#64029)