Hi Rob;
On 05/28/12 13:10, Rob Weir wrote:
I'd like to start the graduation process, with the aim of being a TLP
in time for the 3.4.1 release.
The IPMC has a "Guide to Successful Graduation" page with a lot of
detail and advice: http://incubator.apache.org/guides/graduation.html
The calendar here is especially useful:
http://incubator.apache.org/guides/graduation.html#toplevel
It shows 4 steps:
1) a vote on ooo-dev (a community vote) on whether we want to graduate now
2) a discussion on ooo-dev leading to the draft of a charter for the new TLP
3) an IPMC vote on whether or not to recommend the podling for graduation
4) a vote by the ASF Board on a resolution creating the new TLP
This thread is just a proposal. It is not the actual vote called for
in #1 above. But I'd like to gauge current sentiment. Are we all +1
for going ahead? If not, please list what pre-graduation tasks you
believe need to be done first.
Thanks!
-Rob
A reminder of a small, but IMHO significant, technical issue:
We do have to take the category-B tarballs out of the tree
before graduation.
In general we should also clear out any other unclear
content .. so I am not sure what to say about the
Symphony code since it also contains some code
that has not been fully IP reviewed.
Pedro.