It looks like the time for release is at hand as Geronimo is on the cusp of 1.2 beta.

From an Incubator status we cleared up what was posted by Kevan and me. Anyone want to double check that we are good to go in that area?

From a technical perspective when are we good to ship? Could we cut today, tomorrow, next week? Any outstanding technical items we'd need to get done for Geronimo's 1.2 beta?

-David

On Nov 15, 2006, at 12:00 PM, David Blevins wrote:

So Geronimo 1.2 is coming up and we're going to need to crank out a 2.2 release for them as usual.

From an Incubator perspective we should now be clear with our IP. We've also moved all our code from org.openejb to org.apache.openejb. Also all other license headers have been removed from the source and replaces with the current ASL header. We're still going to need some help to make sure our jars have the required LICENSE.txt and NOTICE files. We also need to make sure all the files that need the ASL header have them -- some things never had license headers on them.

Can I get a show of hands of people who'd like to help with that? I'm not sure of the mechanics but I saw Kevan was using some neat tool to do the same for Geronimo.

From a technical perspective, what things are we waiting on?

-David


Reply via email to