On Saturday, April 16, 2011, <[email protected]> wrote: > Is it time to do an RC for 2.11? I was waiting for > http://trac.osgeo.org/openlayers/ticket/3258 to change state, since > it's marked for 2.11; should I go ahead without it, just grab it, > something else?
Hi Chris, and all How can we move forward with the RC? Since Chris' email some tickets have been set to Review. Should we have an IRC meeting to look at these tickets, assign them to people, and hopefully move forward with 2.11? Thanks, -- Eric Lemoine Camptocamp France SAS Savoie Technolac, BP 352 73377 Le Bourget du Lac, Cedex Tel : 00 33 4 79 44 44 96 Mail : [email protected] http://www.camptocamp.com _______________________________________________ Dev mailing list [email protected] http://lists.osgeo.org/mailman/listinfo/openlayers-dev
