On Saturday, April 16, 2011,  <[email protected]> wrote:
> Is it time to do an RC for 2.11? I was waiting for
> http://trac.osgeo.org/openlayers/ticket/3258 to change state, since
> it's marked for 2.11; should I go ahead without it, just grab it,
> something else?


Hi Chris, and all

How can we move forward with the RC? Since Chris' email some tickets
have been set to Review. Should we have an IRC meeting to look at
these tickets, assign them to people, and hopefully move forward with
2.11?

Thanks,

-- 
Eric Lemoine

Camptocamp France SAS
Savoie Technolac, BP 352
73377 Le Bourget du Lac, Cedex

Tel : 00 33 4 79 44 44 96
Mail : [email protected]
http://www.camptocamp.com
_______________________________________________
Dev mailing list
[email protected]
http://lists.osgeo.org/mailman/listinfo/openlayers-dev

Reply via email to