I'm sponsoring this fasttrack on behalf of Sonam Gupta. The case seeks minor binding and times out on 08/05/2009.
The case delivers the libgs.so shared library and Ghostscript header files as a part of the upgrade to Ghostscript 8.64. Manpages associated with the case have been previously delivered. I don't believe updated contracts for PSARC/2002/619 are needed since the interfaces described haven't changed, but will be pursued if needed. - Dan Template Version: @(#)sac_nextcase 1.68 02/23/09 SMI This information is Copyright 2009 Sun Microsystems 1. Introduction 1.1. Project/Component Working Name: Deliver libgs.so shared library and Ghostscript header files 1.2. Name of Document Author/Supplier: Author: Sonam Gupta 1.3 Date of This Document: 28 July, 2009 4. Technical Description As part of the upgrade to Ghostscript 8.64, we will be delivering the development interfaces, available in the Ghostscript distribution, for third party open source applications to be able to take advantage of. These interfaces are a required component of more recent desktop applications like Evince. 4.5. Interfaces 4.5.1 Exported Interfaces: Interface Status Description ------- ----- --------- /usr/lib/libgs.so Volatile Ghostscript shared library /usr/lib/libgs.so.8 Volatile Ghostscript shared library /usr/lib/libgs.so.8.64 Volatile Ghostscript shared library /usr/include/ghostscript Volatile Ghostscript header files directory /usr/include/ghostscript/iapi.h Volatile Ghostscript header files /usr/include/ghostscript/ierrors.h Volatile Ghostscript header files /usr/include/ghostscript/gdevdsp.h Volatile Ghostscript header files /usr/bin/gsx Volatile GTK+ frontend to libgs.so /usr/bin/gsc Volatile command-line frontend to libgs.so 5. References PSARC/2002/619: Ghostscript Integration PSARC/2007/615: Move foomatic, hpijs, gimp-print, and GhostScript to /usr 6. Resources and Schedule 6.4. Steering Committee requested information 6.4.1. Consolidation C-team Name: SFW 6.5. ARC review type: FastTrack 6.6. ARC Exposure: open 6. Resources and Schedule 6.4. Steering Committee requested information 6.4.1. Consolidation C-team Name: ON 6.5. ARC review type: FastTrack 6.6. ARC Exposure: open