January 11

Agenda:

  1. Dovetail support - baremetal PODs needed Jun Li
    • Colorado support on CI will cease to exist soon and all the PODs will be assigned to master.
    • Due to this, Dovetail will not have any resources or deployments to run against.
    • Apart from not having Colorado, we probably need 4 baremetal PODs (1 per installer) as we still do not have mechanism to share PODs between installers.
  2. CI resource redundancy, All
  3. Action Item Review
  4. AoB

 

Minutes: (link)

  1. Dovetail Support 
    • MathewLi presents slides on Dovetail requirement  (slides on Dovetail wiki page)
    • Dovetail needs stable version of OPNFV deployed in order to run tests
    • Due to OPNFV turning off CI against stable branches (colorado), Dovetail will not have possibility to run against it
    • In order to run Dovetail, we need Colorado deployed on baremetal PODs but we still lack dynamic allocation of resources so Dovetail probably needs 4 baremetal PODs, 1 per installer
    • An additional ARM POD is needed for running Dovetail against ARM on Fuel (5 PODs in total) and Apex is working on ARM support
    • Fatih asks how often we need to run Dovetail against stable branches
    • Hongbo points out that the amount of testing is short - a couple of tests / a few hours
    • Fatih mentions that this will be difficult as we get closer to release time as release testing increases 
  2. CI resource redundancy  
    • due to recent outage and maintenance work jenkins jobs failed and projects were impacted  
    • there is a need to rebalance jenkins jobs to different labs to add redundancy
    • Huawei has POD available for dynamic ci or similar efforts (link)
    • the Infra PTL need to consolidate slides to present to TSC then request time at TSC to present 
  3. MS4 for Danube  
    • David presented his slides on improving definition of MS4 (link)
    • MS4 needs better definition of what it means and how to measure it
    • MS4 is "infra updates completed" currently for projects/senarios, CI capacity, and Infra WG improvements
    • issue #1 timing - when should we have this milestone (currently its 3+ months before release)
    • issue #2 release manager - what questions should be asked to provide status update on completion of this milestone
    • issue #3 derive capacity - how to collect requirements and what is the process for this
    • issue #4 Infra WG plans / improvements - how to coordiante with release manager and how to approve the plan
    • David to upload slides to Software release wiki space and send link to Jack to include in meeting minutes
    • We will discuss this topic again next week to propose solutions to the problem statements

Actions Items:

  1. fdegir and MatthewLi to work with Dovetail in Releng to coordinate a testing plan in the short term
  2. tianwei_wu to return to Infra WG meeting once Huawei POD is available to discuss
  3. Fatih and Jack to propose a solution to rebalancing jenkins jobs in the labs
  4. aricg to follow up with Rudy on UCS support and present update next week
  5. jmorgan1 Move Infra WG meeting minutes to general meeting page


Ongoing Items:


Link to report: https://wiki.opnfv.org/display/meetings/Infra+Working+Group+Meeting
-- 
Jack Morgan
OPNFV Pharos Intel Lab