I'm doing a test upgrade from 8.0.4 to 8.1.6.3.  Finished the 8.1.6 upgrade.
Was about to do the patch installation when I was called into a meeting then
got 2 phone calls (this all kept happening during the upgrade also) and had
several people stop by.  Finally got back to it, started the patch
installation and soon realized that I hadn't shut the database down before
doing so.  I immediately stopped to patchset installation and tried to shut
down the database but I get the following errors:

$ svrmgrl

Oracle Server Manager Release 3.1.6.0.0 - Production
Copyright (c) 1997, 1999, Oracle Corporation.  All Rights Reserved.

ORA-03113: end-of-file on communication channel
SVRMGR> connect internal
Password:

Is there anything I can do or do I need to restore from backup and start the
whole procedure from scratch?



2nd question:  Is it possible to do the patch install and then do the
upgrade?  The patchset instructions imply not, but there's a technical forum
response that implies you can.  Which is it?
-- 
Please see the official ORACLE-L FAQ: http://www.orafaq.com
-- 
Author: Miller, Jay
  INET: [EMAIL PROTECTED]

Fat City Network Services    -- (858) 538-5051  FAX: (858) 538-5051
San Diego, California        -- Public Internet access / Mailing Lists
--------------------------------------------------------------------
To REMOVE yourself from this mailing list, send an E-Mail message
to: [EMAIL PROTECTED] (note EXACT spelling of 'ListGuru') and in
the message BODY, include a line containing: UNSUB ORACLE-L
(or the name of mailing list you want to be removed from).  You may
also send the HELP command for other information (like subscribing).

Reply via email to