[ 
https://issues.apache.org/jira/browse/HDDS-3662?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Li Cheng reassigned HDDS-3662:
------------------------------

    Assignee: Li Cheng

> decouple finalize and destroy pipeline
> --------------------------------------
>
>                 Key: HDDS-3662
>                 URL: https://issues.apache.org/jira/browse/HDDS-3662
>             Project: Hadoop Distributed Data Store
>          Issue Type: Sub-task
>            Reporter: Li Cheng
>            Assignee: Li Cheng
>            Priority: Major
>
> We have to decouple finalize and destroy pipeline. We should have two 
> separate calls, closePipeline and destroyPipeline.
> Close pipeline should only update the pipeline state, it’s the job of the 
> caller to issue close container commands to all the containers in the 
> pipeline.
> Destroy pipeline should be called from pipeline scrubber, once a pipeline has 
> spent enough time in closed state the pipeline scrubber should call destroy 
> pipeline.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: ozone-issues-unsubscr...@hadoop.apache.org
For additional commands, e-mail: ozone-issues-h...@hadoop.apache.org

Reply via email to