On 13.06.2013 19:10, Pascal Rapicault wrote:

For me the back button is outright disabled. And the real use case is even more 
convoluted -- for bugfix updates showing the last version
is fine, whereas if there are two updates from different release series, both 
better be displayed.
      The update workflow implemented in p2 is definitely not tailored for 
that. Instead it is tailored to help the user stay up to date w/o
fuss or questions. As such it will always propose the highest version available 
for install.
You may want to look at the AvailableIUsPage since it is able to show different 
versions and display an icon when an IU presented is an
update of something installed. Now if you couple this with the fact that an 
update can change IU id (for example IU B v1.0 could be an
update of IU A 2.0), then may be you can present the various updates all at the 
same time for different streams (the streams would have a
different ID).

I will take a look, thanks.

--
Vladimir Prus
CodeSourcery / Mentor Graphics
http://www.mentor.com/embedded-software/
_______________________________________________
p2-dev mailing list
[email protected]
https://dev.eclipse.org/mailman/listinfo/p2-dev

Reply via email to