Let me check it. Thanks. -Zhanping 2010/4/21 Manuel González <iinmg...@ucv.udc.es>
> I use Paraview to display datasets with changing geometry over time, but > constant connectivity. > > The datasets are generated in Ensight Gold format by my own code. > > I would like to reduce the dataset size by using the 'change_coords_only' > option in the Ensight Gold case file, so I can define the connectivity only > in the geometry file for the initial timestep. > > But it seems that Paraview still requires the (non changing) connectivity > in > the geometry file for each timestep even when 'change_coords_only' is > present, otherwise the number of cells is 0 except for the first time step. > > Does anybody have a working example of 'change_coords_only' which only > provides the connectivity in the first timestep? > > Best regards, > Manuel > > ********************************************************* > Manuel J. González Castro > Universidad de A Coruña > > Escuela Politécnica Superior > Mendizábal s/n, 15403 Ferrol > España > > _______________________________________________ > Powered by www.kitware.com > > Visit other Kitware open-source projects at > http://www.kitware.com/opensource/opensource.html > > Please keep messages on-topic and check the ParaView Wiki at: > http://paraview.org/Wiki/ParaView > > Follow this link to subscribe/unsubscribe: > http://www.paraview.org/mailman/listinfo/paraview > -- Zhanping Liu, PhD Kitware, Inc. 28 Corporate Drive Clifton Park, NY 12065-8662 Phone: 518-371-3971 x 138 http://www.zhanpingliu.org
_______________________________________________ Powered by www.kitware.com Visit other Kitware open-source projects at http://www.kitware.com/opensource/opensource.html Please keep messages on-topic and check the ParaView Wiki at: http://paraview.org/Wiki/ParaView Follow this link to subscribe/unsubscribe: http://www.paraview.org/mailman/listinfo/paraview