Let me check it.
Thanks.
-Zhanping

2010/4/21 Manuel González <iinmg...@ucv.udc.es>

> I use Paraview to display datasets with changing geometry over time, but
> constant connectivity.
>
> The datasets are generated in Ensight Gold format by my own code.
>
> I would like to reduce the dataset size by using the 'change_coords_only'
> option in the Ensight Gold case file, so I can define the connectivity only
> in the geometry file for the initial timestep.
>
> But it seems that Paraview still requires the (non changing) connectivity
> in
> the geometry file for each timestep even when 'change_coords_only' is
> present, otherwise the number of cells is 0 except for the first time step.
>
> Does anybody have a working example of 'change_coords_only' which only
> provides the connectivity in the first timestep?
>
> Best regards,
> Manuel
>
> *********************************************************
> Manuel J. González Castro
> Universidad de A Coruña
>
> Escuela Politécnica Superior
> Mendizábal s/n, 15403 Ferrol
> España
>
> _______________________________________________
> Powered by www.kitware.com
>
> Visit other Kitware open-source projects at
> http://www.kitware.com/opensource/opensource.html
>
> Please keep messages on-topic and check the ParaView Wiki at:
> http://paraview.org/Wiki/ParaView
>
> Follow this link to subscribe/unsubscribe:
> http://www.paraview.org/mailman/listinfo/paraview
>



-- 
Zhanping Liu, PhD
Kitware, Inc.
28 Corporate Drive
Clifton Park, NY 12065-8662
Phone: 518-371-3971 x 138
http://www.zhanpingliu.org
_______________________________________________
Powered by www.kitware.com

Visit other Kitware open-source projects at 
http://www.kitware.com/opensource/opensource.html

Please keep messages on-topic and check the ParaView Wiki at: 
http://paraview.org/Wiki/ParaView

Follow this link to subscribe/unsubscribe:
http://www.paraview.org/mailman/listinfo/paraview

Reply via email to