Hi Utkarsh,
this is what i get:

(gdb) where
#0 0x00002b58ed6e41f0 in __nanosleep_nocancel () from /lib64/libpthread.so.0 #1 0x00002b58e5b2f8c8 in MPI_SGI_millisleep (milliseconds=<value optimized out>) at sleep.c:36 #2 0x00002b58e5b27c2c in MPI_SGI_slow_request_wait (request=0x7fffc53bdb5c, status=0x7fffc53bdb30, set=0x7fffc53bdb58, gen_rc=0x7fffc53bdb54) at req.c:1416
#3  0x00002b58e5adc463 in MPI_SGI_slow_barrier (comm=1) at barrier.c:190
#4  0x00002b58e5ad06aa in MPI_SGI_finalize () at adi.c:734
#5  0x00002b58e5af18bc in PMPI_Finalize () at finalize.c:29
#6 0x00002b58e682b49c in vtkPVMain::Finalize () at /home/pratikm/source/ParaView/ParaView-3.10.1/Servers/Filters/vtkPVMain.cxx:160 #7 0x000000000040268e in main (argc=5, argv=0x7fffc53bdd88) at /home/pratikm/source/ParaView/ParaView-3.10.1/Servers/Executables/pvserver.cxx:52

best,
pratik

On Sunday 29 May 2011 02:16 AM, Utkarsh Ayachit wrote:
Once the pvserver process has hanged, connect to any one of the processes with gdb. Use 
gdb --pid= to attach to a particular process. Then type "where" and that will 
give you the call stack. Do this for both the processes and we'd know where they ate 
stuck.

Utkarsh



On May 27, 2011, at 10:58 AM, pratik<pratik.mal...@gmail.com>  wrote:

Also,
1) pvserver disconnects properly when run on head node standalone
2) pvserver disconnects properly when run on *one* node via PBS job scheduler.

problem arises when i try to use more than one node in the cluster.

thanks,
pratik
On Friday 27 May 2011 08:25 PM, pratik wrote:
Hi Utkarsh,
This problem always shows up, even if i do not load any data.
The build is: CMAKE_BUILD_TYPE=DEBUG (PV 3.10.1, both server and client)
Can you please tell me how I can do a stack trace of pvserver?

best,
pratik

On Friday 27 May 2011 06:51 PM, Utkarsh Ayachit wrote:
pvserver is designed to quit after the client disconnects. Does this
show up after a particular operations or always? Is this a debug
build? Can you post the stack track for the place where the server is
wainting after client quits?



On Fri, May 27, 2011 at 12:16 AM, pratik<pratik.mal...@gmail.com>   wrote:
Hi everyone,
I have pvserver connecting to my client through reverse connection. However,
after i disconnect from the gui, the job (submitted through PBSPro 10.6)
continues to run, and i checked and saw that pvserver was still running on
the nodes. Is there any option by which the pbs job will terminate when i
disconnect from paraview client gui?

thanks,
pratik
_______________________________________________
Powered by www.kitware.com

Visit other Kitware open-source projects at
http://www.kitware.com/opensource/opensource.html

Please keep messages on-topic and check the ParaView Wiki at:
http://paraview.org/Wiki/ParaView

Follow this link to subscribe/unsubscribe:
http://www.paraview.org/mailman/listinfo/paraview


_______________________________________________
Powered by www.kitware.com

Visit other Kitware open-source projects at 
http://www.kitware.com/opensource/opensource.html

Please keep messages on-topic and check the ParaView Wiki at: 
http://paraview.org/Wiki/ParaView

Follow this link to subscribe/unsubscribe:
http://www.paraview.org/mailman/listinfo/paraview

Reply via email to