PDF-Forms is a service provided by PDFzone.com | http://www.pdfzone.com/ __________________________________________________________________

This is a big case of UBS ehh.... oooops...

I claimed:

This will lead to the problems, but if we do the calculation only when b.value is not zero, we will be on the safe side:

    if (b.value * 1) == 0) {
    event.value = a.value / b.value ;
    }

By multiplying b.value with 1, we make sure that we have a valid number.

And that is pure and applied Quatsch...

Correct would be:

    if (b.value * 1) != 0) {
    event.value = a.value / b.value ;
    }


I apologize for the mess-up.



Max Wyss
PRODOK Engineering
Low Paper workflows, Smart documents, PDF forms
CH-8906 Bonstetten, Switzerland

Fax:  +41 1 700 20 37
  or  +1 815 425 6566
e-mail:  mailto:[EMAIL PROTECTED]
http://www.prodok.com



[ Building Bridges for Information ]


______________________



Shameless Plug:

My next conference appearances and workshops:
• Conference presentations at the 2004 Symposium of the BFMA, May 23 to 27 in Reno, Nevada (http://www.bfma.org) and pre-/post-conference workshop, May 22/23 and 27, organized by essociates Group (http://www.essociatesgroup.com/AdvancedAcrobatForms.htm)
• And, as always, available for on-site workshops/tutorials/consulting.



_________________________



To change your subscription:
http://www.pdfzone.com/discussions/lists-pdfforms.html



Reply via email to