From: migue dot m at gmail dot com Operating system: Windows XP SP3 PHP version: 5.2.9 PHP Bug Type: Calendar related Bug description: The number of weeks in 2009 are 52, not 53
Description:
------------
I use this code to calculate the week number for December 28 of 2009:
strftime("%V", mktime(12,0,0,12,28,$x));
This function have to return "1" but it returns "53" and the 2009 year
hasn't 53 weeks.
I also tried other code with the same results:
date('W', strtotime("December 28, $x"));
--
Edit bug report at http://bugs.php.net/?id=48105&edit=1
--
Try a CVS snapshot (PHP 5.2):
http://bugs.php.net/fix.php?id=48105&r=trysnapshot52
Try a CVS snapshot (PHP 5.3):
http://bugs.php.net/fix.php?id=48105&r=trysnapshot53
Try a CVS snapshot (PHP 6.0):
http://bugs.php.net/fix.php?id=48105&r=trysnapshot60
Fixed in CVS:
http://bugs.php.net/fix.php?id=48105&r=fixedcvs
Fixed in CVS and need be documented:
http://bugs.php.net/fix.php?id=48105&r=needdocs
Fixed in release:
http://bugs.php.net/fix.php?id=48105&r=alreadyfixed
Need backtrace:
http://bugs.php.net/fix.php?id=48105&r=needtrace
Need Reproduce Script:
http://bugs.php.net/fix.php?id=48105&r=needscript
Try newer version:
http://bugs.php.net/fix.php?id=48105&r=oldversion
Not developer issue:
http://bugs.php.net/fix.php?id=48105&r=support
Expected behavior:
http://bugs.php.net/fix.php?id=48105&r=notwrong
Not enough info:
http://bugs.php.net/fix.php?id=48105&r=notenoughinfo
Submitted twice:
http://bugs.php.net/fix.php?id=48105&r=submittedtwice
register_globals:
http://bugs.php.net/fix.php?id=48105&r=globals
PHP 4 support discontinued: http://bugs.php.net/fix.php?id=48105&r=php4
Daylight Savings: http://bugs.php.net/fix.php?id=48105&r=dst
IIS Stability:
http://bugs.php.net/fix.php?id=48105&r=isapi
Install GNU Sed:
http://bugs.php.net/fix.php?id=48105&r=gnused
Floating point limitations:
http://bugs.php.net/fix.php?id=48105&r=float
No Zend Extensions:
http://bugs.php.net/fix.php?id=48105&r=nozend
MySQL Configuration Error:
http://bugs.php.net/fix.php?id=48105&r=mysqlcfg
