+1 Here's what I tested:
* Verified all MD5, SHA, and PGP signatures against the artifacts * Verified that the contents of the tar.gz artifacts matched that of the zip artifacts * Verified that the contents of the source distribution matched that of the SVN tag exactly * Verified that the source distribution compiles against the following environments: * Linux x64 - Sun JDK 1.6 * Linux x64 - Sun JDK 1.7 * Linux x64 - OpenJDK 1.6 * Windows x86 - Sun JDK 1.6 * Inspected source and binary distribution RAT reports: * Checked that all files were properly licensed * Checked that all non-Pivot jars were covered by the NOTICE file * Ran some sample applications against the binary distribution * The HTTPClient included in the tools jar * The tutorial demo on my local system * Browsed the Javadocs in the binary distribution * Tried to build against JDK1.5 to verify proper failure -T On Thu, May 28, 2009 at 3:56 PM, Todd Volkert <[email protected]> wrote: > All: > > The Pivot 1.2 RC1 release candidate has been tagged, packaged, and is > ready for a vote. The artifacts, RAT reports, KEYS file, and release > notes can be found at > http://people.apache.org/~tvolkert/dist/pivot/v1.2-rc1/. The tag from > which the release artifacts were generated can be found at > http://svn.apache.org/repos/asf/incubator/pivot/tags/v1.2-rc1/. > > In addition, my PGP public code signing key can be found at the MIT > key server (http://pgp.mit.edu/) and The SKS key server > (http://www.pramberger.at/peter/services/keyserver/). > > Notes that the JUnit tests included in the source distribution are > compiled as part of the build process but are not automatically run > (the same was true of the 1.1 release). This will be addressed in the > 1.3 release (see PIVOT-131). > > Please vote to publish this release by Monday, June 1 20:00 GMT > (allowing an extra day since the voting period spans the weekend). In > so doing, please include the testing you performed to arrive at your > vote. > > [ ] +1 Publish > [ ] +0 > [ ] -0 > [ ] -1 Don't publish (specify why) > > Upon a positive majority of binding votes, the results of this vote > will be brought to the Incubator PMC and voted upon there. > > Thanks, > -T >
