girl-killer-fatso-teddy's compound too. ?
what are you talking about ?

On Jan 6, 6:26 am, Travis <[email protected]> wrote:
> Good  Now maybe he can get the wind generators off shore from
> girl-killer-fatso-teddy's compound too.
>
> On Tue, Jan 6, 2009 at 4:41 AM, Florida Cracker 
> <[email protected]>wrote:
>
>
>
>
>
>
>
> > Wind, Waves, and Watts [ the Obama return to sanity has already
> > begun ]
> >http://www.truthout.org/010509EA
> > The steady, strong winds over the Atlantic off New England have
> > attracted another developer interested in harnessing them for power
> > generation. A new wrinkle in the proposal by Grays Harbor Ocean
> > Energy
> > Company, of Washington state, is that the supports anchoring each
> > wind
> > turbine platform to the ocean floor would be designed in a way to
> > turn
> > wave action into electricity as well.
>
> >    For Grays Harbor, this feature serves two purposes: It increases
> > the likelihood that its platforms will be producing power even when
> > winds are still, and it qualifies the initial stages of the project
> > for review by the Federal Energy Regulatory Commission instead of the
> > Minerals Management Service of the Department of the Interior.
>
> >    Why one federal agency should have supervision over ocean wave
> > energy and another over ocean wind energy is one of those
> > governmental
> > head-scratchers that turn organization charts into mazes. Congress
> > should resolve the disparity as soon as possible. It should also
> > facilitate all offshore energy projects by granting the National
> > Oceanographic and Atmospheric Administration increased funds for
> > seabed surveys.
>
> >    In the meantime, it is to Grays Harbor's advantage to be seeking
> > a
> > preliminary permit from FERC, which is considered more responsive
> > than
> > Minerals Management. Although the law giving Minerals Management
> > authority over offshore wind projects passed in 2005, the agency is
> > still drawing up regulations for awarding leases and overseeing
> > projects. It can proceed with oversight of the Cape Wind project on
> > Nantucket Sound because the 2005 law specifically grandfathered it.
>
> >    If Grays Harbor gets its preliminary permit from FERC, it will be
> > able to deploy a platform with a meteorological tower at its proposed
> > site 12 to 17 miles south of Nantucket. This will provide the wind
> > and
> > wave data it needs to determine if the project is feasible. Another
> > site being looked at is south of Block Island. Grays Harbor's CEO
> > Burton Hamner likens his three-sided turbine platforms to a "big,
> > triangular footstool." He acknowledges that they have yet to be
> > tested
> > in the rough conditions of the Atlantic in depths of up to 200 feet.
>
> >    If Hamner can bring just one of his New England projects to
> > fruition, it will make a substantial contribution to the energy grid.
> > Each site could produce up to 1,000 megawatts, about the output of
> > the
> > Seabrook nuclear plant, and an average of 400.
>
> >    While developers have installed many turbines in the US west, the
> > nation lags behind Europe in exploiting stronger offshore winds.
> > Getting regulations in place promptly and investing more in basic
> > seabed research are two needed steps to encourage this form of
> > renewable energy.
>
> --
> *~@):~{>- Hide quoted text -
>
> - Show quoted text -
--~--~---------~--~----~------------~-------~--~----~
Thanks for being part of "PoliticalForum" at Google Groups.
For options & help see http://groups.google.com/group/PoliticalForum

* Visit our other community at http://www.PoliticalForum.com/  
* It's active and moderated. Register and vote in our polls. 
* Read the latest breaking news, and more.
-~----------~----~----~----~------~----~------~--~---

Reply via email to