North Anna does not use additional measures to cool water temperatures or 
ambient temperatures in the Cavity.  We do use light weight cooling vests to 
help the workers in this hot, humid environment.  The vests can be re-charged 
with cooling medium in the field.


Barbara J. Thompson
Supervisor of Exposure Control
Dominion - North  Anna Power Station
Email:  [email protected]
Phone:  540-894-2605
Beeper: #3469
FAX:  540-894-2408


From: [email protected] [mailto:[email protected]] On Behalf Of 
[email protected]
Sent: Tuesday, October 12, 2010 9:25 AM
To: [email protected]
Cc: [email protected]
Subject: Powernet: Cavity Decon Stay Times

Limerick asked this question before and got no response.  We are putting it out 
again for review.  Rad Engineering is trying evaluate "out of the box" methods 
for increasing stay times due to heat during reactor re-assembly and cavity 
decon. Any information is appreciated.


Limerick is a Boiling Water Reactor (BWR). Stays times for initial cavity 
decontamination activities during refueling outages are limited to 30 to 45 
minutes due to temperatures.

1)    Prior to reactor cavity drain down - What methods (other than shut down 
cooling) are used to control water temperature prior to drain down to reduce 
temperatures in the cavity post drain down? (Note: A large in-vessel inspection 
or repair scope may limit the use of shut down cooling.)
2)       Post reactor cavity drain down - What method is used (if any) to 
control or reduce reactor cavity temperatures after drain down to increase stay 
times? (e.g., in-cavity air-conditioning, evaporative cooling fans).
3)    If you don't do anything to reduce temperatures for worker stay times, 
please state that and why.

You can respond via Powernet or contact our Rad. Engineer directly. 
[email protected]<mailto:[email protected]> or 
610-718-2248.

Thanks
Linda Parlatore




************************************************** This e-mail and any of its 
attachments may contain Exelon Corporation proprietary information, which is 
privileged, confidential, or subject to copyright belonging to the Exelon 
Corporation family of Companies. This e-mail is intended solely for the use of 
the individual or entity to which it is addressed. If you are not the intended 
recipient of this e-mail, you are hereby notified that any dissemination, 
distribution, copying, or action taken in relation to the contents of and 
attachments to this e-mail is strictly prohibited and may be unlawful. If you 
have received this e-mail in error, please notify the sender immediately and 
permanently delete the original and any copy of this e-mail and any printout. 
Thank You. **************************************************


CONFIDENTIALITY NOTICE:  This electronic message contains
information which may be legally confidential and or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect.  The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized.  If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful.  If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it.  Thank you.

Reply via email to