Palo Verde provides the following response:

1.     PWR

2.     Palo Verde has a fixed goal for non-outage periods. There is not a 
monthly goal that changes.

3.     Palo Verde does not track non-recoverable areas.

4.     Percentage. The current goal is 0.25% of the Radiological Controlled 
Area for each unit.

5.     Here is the guidance:
Total trackable footage for each unit is 130,838-ft only non-outage footage is 
to be reported on the morning report.

Exceptions:        These areas are not tracked in the database per the RP 
department director

                                Gas Stripper Skid & grating area behind Skid
                                Chemistry hot lab valve gallery
                                Equipment drain tank room
                                All pump pedestals and equipment skids
                                High level storage areas
                                Filter and ion exchanger cubicles on the 120 
Aux. building
                                New fuel storage pit
                                Containment
                                Hot Machine shop decon sink  & Spray booths
                                Decon, laundry, DAWPS facility, and Low Level 
Radioactive Materials Storage Facility.
                                Other areas as designated by the RP Site 
Director



6.     Routine decontamination is performed on all clean areas. Valve leaks are 
controlled with drip catches to prevent from contaminating the floor.

7.     130,838 sq ft per unit.

8.     Non-recoverable square feet are not calculated or tracked.

Palo Verde uses a database to track the contaminated square feet. The number of 
square feet and the percentage is reported on the daily status report. We do 
not track ancillary buildings like the Low Level Radioactive Materials Storage 
Facility. We do not track areas we will never try to decontaminate like the 
Containment building. We do not track places where a person can't stand like a 
pump skid.

                              Gordon Nelson
                              Radiological Engineering
                              Palo Verde Nuclear Generating Station
                              Phone (623) 393-5200
                              Fax   (623) 393-6640
                              Cell  (623) 238-0542
                              Pager (877) 466-7534
                              [email protected]



From: [email protected] [mailto:[email protected]] On Behalf Of 
Barnhill, Carlette
Sent: Tuesday, June 28, 2011 4:28 AM
To: '[email protected]'
Subject: Powernet: Contaminated Square Footage

At the risk of being redundant.....am sending this out again in hopes of 
responses...

The Progress Energy "fleet" currently does not have a consensus definition of 
"non-recoverable contaminated square footage" as it relates to key performance 
indicator (KPI) tracking.  We are seeking input from the industry to help 
implement performance tracking utilizing best practices and compliance with 
INPO 05-008 Rev 1.
Please provide answers to the following:


1.       PWR or BWR?

2.       Do you have a monthly goal for recoverable area?

3.       Do you have a monthly or annual  goal for non-recoverable area?

4.       Is your goal a percentage value or a square footage value?

5.        What is your definition of "non-recoverable"?

6.       Do you utilize regular (some set frequency) decon to maintain 
"recoverable areas" that would normally be non-recoverable without this 
practice?

7.       What is your recoverable value (sq ft)?

8.       What is your non-recoverable value (sq ft)?

9.       Who may we contact for additional information?

Thank you for your time.

Reply to:
Preston (Bud) McLendon
RC Supervisor-PGN Brunswick Nuclear Plant
910-457-2537
[email protected]







--- NOTICE ---

This message is for the designated recipient only and may contain confidential, 
privileged or proprietary information.  If you have received it in error, 
please notify the sender immediately and delete the original and any copy or 
printout.  Unintended recipients are prohibited from making any other use of 
this e-mail.  Although we have taken reasonable precautions to ensure no 
viruses are present in this e-mail, we accept no liability for any loss or 
damage arising from the use of this e-mail or attachments, or for any delay or 
errors or omissions in the contents which result from e-mail transmission.

Reply via email to