I have been asked to compare RP's "non-core" responsibility commitments at our 
site to other sites.  To assist in this effort, I would appreciate answers to 
the following questions:

Does RP calibrate radiation monitors? Yes
                If so, which type?
                                Area Monitors?  Remote monitoring Area Monitors
                                Process Monitors? No.
                                Accident Monitors? No.
Does RP sample storm drains (per ANI, for tritium and gamma analysis)? Yes.
                If so, at what frequency are these samples collected?  Monthly 
and quarterly.
Does RP obtain soil samples from locations inside the site boundary for gamma 
analysis? No.
                If so, at what frequency are these samples collected? N/A
Does RP perform sampling of volumetric materials (oil, soil, concrete, etc.) 
for unconditional release? Yes.
Is RP responsible for calibrating/maintaining/daily operability checks for the 
following?
                                Gamma Spectroscopy Equipment Yes.
                                Alpha and beta proportional counters Yes.
Is RP responsible for the Confined Space Program? No.
                Does RP perform all atmospheric sampling for confined spaces? 
Yes.
Is RP responsible for sluicing secondary resin? No.
Is RP responsible for sluicing primary resin? No, just HP job coverage.
Is RP responsible for dewatering resin for shipment? No, just HP job coverage.
Is RP responsible for packaging radioactive waste casks for shipment? Yes.
Do RP technicians manage all day to day dosimetry operations (issue TLDs, 
perform Personnel Exposure Investigations for anomalous ED or TLD readings, 
badge exchange, etc.)? Yes.

And finally, How many units do you have (2 PWR units) , and how many RP 
technicians do you have per unit?  Total of 35 HP Technicians/Equivalents  - we 
do not have separate HP staff per unit.  Please include all RP 
technician/equivalents who perform ALARA planning, RWPs, Outage Planning, 
Dosimetry, Instruments, Respiratory Protection, Radioactive Waste, Confined 
Space sampling/permitting no matter what organization they report to.


Thanks for helping make Powernet work for all of us!!!!!




Jerry Barber
Lead RC Specialist
H.B. Robinson Nuclear Plant
843-857-1496
[email protected]




CONFIDENTIALITY NOTICE:  This electronic message contains
information which may be legally confidential and/or privileged and
does not in any case represent a firm ENERGY COMMODITY bid or offer
relating thereto which binds the sender without an additional
express written confirmation to that effect.  The information is
intended solely for the individual or entity named above and access
by anyone else is unauthorized.  If you are not the intended
recipient, any disclosure, copying, distribution, or use of the
contents of this information is prohibited and may be unlawful.  If
you have received this electronic transmission in error, please
reply immediately to the sender that you have received the message
in error, and delete it.  Thank you.

Reply via email to