Duke Energy would like to know how or if the following have been incorporated as process simplification methods to the Routine Survey Process: * Current technology and station processes (e.g., DRMS, Primary to Secondary Leak Rate Calculations, etc.) that can be incorporated into the routines process to reduce the frequency of areas currently being surveyed. * Utilize 10CFR20.1003, 10CFR20.1501(a), and INPO 05-008 (Guidelines for Radiological Protection at Nuclear Power Stations, Rev. 1) as a basis for the reduction/elimination of radiological surveys currently being performed Thank you, Jerri Walters Duke Energy Catawba Nuclear Station RP Technical Staff (803) 701-3422
