V. C. Summer would like your input on the following:

1.      Does your plant have a secondary test method or verification process 
that is utilized to ensure that a Poly Hic or Carbon Steel liner has been 
successfully dewatered prior to shipment?

2.      If so, what is your secondary test method/verification process?


Thanks in advance for your assistance,
Diana


Responses may be made directly to:

Ryan Fogle *VC Summer Nuclear Station ยท  Radwaste Supervisor

W 803.345.4217  F 803.345.4844   [email protected]<mailto:[email protected]>


Reply via email to