Taking into consideration 18 and 24 month fuel cycles, do any stations allow longer periods between 10CFR61 updates greater than the suggested annual update for Cass B/C waste and biennial update for Class A waste?
(The NRC Branch Technical Position on waste classification 5/11/1983 does allow for analysis extensions greater than two years for Waste Class A and greater than one year for Waste Class B or C.) Thanks, Graham Johnson, CHP Radiation Protection General Office Duke Energy
