We use the H-810DM, but if you still want to see our cal procedure, let me know.
Rick Rick Treinen Radiation Protection Engineer Pacific Gas & Electric Company Diablo Canyon Power Plant Bldg 104-2-216 Avila Beach, CA 93424 O: 805.545.6481 | C: 805.769.8001 From: Powernet <powernet-boun...@hpspowernet.org> On Behalf Of Macho, Michael via Powernet Sent: Tuesday, September 10, 2019 9:22 AM To: powernet@hpspowernet.org Cc: Macho, Michael <michael.ma...@luminant.com> Subject: [Powernet] Does anyone use and calibrate the RadeCo H810DC battery powered high volume airsampler and might share their procedure. *****CAUTION: This email was sent from an EXTERNAL source. Think before clicking links or opening attachments.***** Does anyone use and calibrate the RadeCo H810DC battery powered high volume airsampler and might share their procedure. I have been unable to find the time to write a procedure for our technicians to do this flow calibration on-site using a BK Precision 1901 DC power supply. Michael Macho Radiation Protection Staff michael.ma...@luminant.com<mailto:michael.ma...@luminant.com> [cid:image003.jpg@01D45A15.8872E070] SAFETY is first QUALITY SCHEDULE Luminant Power Comanche Peak Nuclear Power Plant 6322 North FM 56 or PO Box 1002 Mail Code 005A Glen Rose, TX 76043 (254)897-5698 /(254)897-8163 (817)559-1997 Cell [Vistra-TXUE-Lum-lockup-all-03] Confidentiality Notice: This email message, including any attachments, contains or may contain confidential information intended only for the addressee. If you are not an intended recipient of this message, be advised that any reading, dissemination, forwarding, printing, copying or other use of this message or its attachments is strictly prohibited. If you have received this message in error, please notify the sender immediately by reply message and delete this email message and any attachments from your system.
_______________________________________________ Powernet mailing list Powernet@hpspowernet.org http://hpspowernet.org/mailman/listinfo/powernet_hpspowernet.org