Chao – it might be that the numerical integration formulas that we’re using in 
Chrono are not the best fit for you. If you look at celestial mechanics, I 
imagine you’d need symplectic integrators, perhaps high order. We don’t have 
that.
I would give the HHT integrator a shot. I would set alpha to zero to get a 
trapezoidal integration formula, which in principle doesn’t dissipate energy 
and is second order. Not clear if that would work, but give it a shot and let 
us know if it made any difference.
Good luck.
Dan

From: [email protected] <[email protected]> On Behalf 
Of Chao Zhang
Sent: Thursday, February 16, 2023 2:53 AM
To: ProjectChrono <[email protected]>
Subject: [chrono] Issue for setting multiple ChLinkMotorRotationSpeed

Hi everyone,
I am using chrono to test the performance of multiple specified axes of 
rotation by implementing a rotation motion of the Earth while orbiting the Sun, 
but when I use two ChLinkMotorRotationSpeed applied to the rigid body of the 
Earth, the results of the simulation are not satisfactory.
For two or more ChLinkMotorRotationSpeed constraints, how can I achieve 
accurate results for multiple ChLinkMotorRotationSpeeds on a rigid body by 
having some of them move with the rigid body?
Any suggestions would be appreciated!

Chao
--
You received this message because you are subscribed to the Google Groups 
"ProjectChrono" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to 
[email protected]<mailto:[email protected]>.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/projectchrono/2f1c760b-08ff-4e96-ae59-b0259877d8e0n%40googlegroups.com<https://groups.google.com/d/msgid/projectchrono/2f1c760b-08ff-4e96-ae59-b0259877d8e0n%40googlegroups.com?utm_medium=email&utm_source=footer>.

-- 
You received this message because you are subscribed to the Google Groups 
"ProjectChrono" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To view this discussion on the web visit 
https://groups.google.com/d/msgid/projectchrono/DM8PR06MB77032E4AEFD8410B4C4927DBB1A69%40DM8PR06MB7703.namprd06.prod.outlook.com.

Reply via email to