Aloha kakou,

In response to Prema‛s inquiry (see below), here is an update on the timetable 
for consultant work products for the preparation of the draft CDP.

At the last CDP Team meeting on August 27, which Stephanie Bath attended as 
representative of the Steering Committee (SC), the agreed-upon goal was to wrap 
up SC comments on preliminary consultant recommendations by December so that a 
draft CDP could be presented in January. 

Following are the steps to reaching that goal:

1. PlanPacific (PP) was to prepare a draft vision statement and themes for the 
CDP for review by the SC at its September 20 meeting.  PP committed to 
submitting this in time to be included with the posted meeting agenda. PP 
submitted these materials to the county on September 7.  In addition, PP 
submitted a table of draft goals, objectives and actions by theme, with 
cross-references to the Working Papers, Working Group reports, and the Small 
Group Meeting results.  Proposed actions relating to roadway connectivity and 
corridors were more tentative, pending completion of the transportation 
subconsultant‛s (PB) report.

2. SC began its review of the draft vision statement, themes, goals, objectives 
and actions at its September 20 meeting and agreed to meet on October 4, in 
advance of its regularly scheduled meeting for that month, which falls on 
October 18.  PB is still scheduled to submit its report and recommendations at 
the end of September.  Wayne Yoshioka will present PB‛s recommendations at the 
October 4 SC meeting.

3.  PB‛s recommendations will be incorporated into the table of draft goals, 
objectives and actions by PP and the revised table will be resubmitted to the 
SC to resume its review and comments at the October 18 meeting.  The SC may 
choose to hold more frequent meetings, if necessary, to complete its review by 
December.  

John   


-----Original Message-----
From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Prema
Sent: Wednesday, September 26, 2007 8:23 AM
To: Puna Working Group report evaluation list
Cc: Puna WG Members; Puna CDP Participants; [EMAIL PROTECTED]
Subject: Re: [Puna-WG-eval] TR - Consultant's Contract Timeline for 
Transportation Issues in Puna


>At 04:28 PM 8/24/2007, John P. Whalen wrote:
>
>I will send, via the listserve, more complete information about the 
>remaining schedule for the CDP preparation phase after the CDP Team 
>(including a Steering Committee representative) meets on Monday 
>afternoon. In the meantime, I can address some of your questions.



Aloha John,

Can you report to us on your August meeting, now?



>At 04:28 PM 8/24/2007, John P. Whalen wrote:
>
>Wayne Yoshioka is scheduled to submit his written report at the end 
>of September.  His only submitted work products to date are his 
>powerpoint presentation and the bulllet-point summary included in 
>the last section of Working Paper #3, both of which are available online.



Has a date and time been determined for Wayne Yoshioka's final report?

If so, then can you assure us that the items outlined in his alleged 
contract (enclosed) will be addressed in his final report?


forward!
devotion, prema


++++++++++++++++++++++++++++++++++++++++++

CONTRACT

Between: PLANPACIFIC, INC.
and
PB AMERICAS, INC.

For: TRANSPORTATION PLANNING SERVICES related to the PUNA COMMUNITY 
DEVELOPMENT PLAN

PlanPacific, Inc., has been contracted by the Planning Department, 
County of Hawaii (hereinafter "Department") to prepare the Puna 
Community Development Plan. By this Contract, Prime Consultant 
PlanPacific (hereinafter "PRIME") retains and engages PB Americas, 
Inc. (hereinafter "SUB-CONSULTANT") to provide professional planning 
services related to the Puna Community Development Plan.

SCOPE OF WORK

Sub-consultant will assist Prime in performing the tasks as enumerated below.

I. Highway 130 and Puna Makai Alternate Route

     A. Conduct traffic analyses to recommend:

         1. Whether widening Highway 130 from two to four lanes 
obviates the need for the Puna makai alternate route;

         2. If needed, the number of lanes for the Puna makai 
alternate route and whether the Puna makai alternate route should 
continue through Hawaiian Paradise Park;

         3. Evaluate the need and optimal location for traffic 
signals and/or roundabouts along Highway 130 to enable turning 
movements from intersecting streets;

         4. If the Puna makai alternate route must traverse Hawaiian 
Paradise Park, recommend alignment and context-sensitive design.

     B. Attend two public meetings to present findings.

II. Highway 11

     A. Evaluation of the cost-effectiveness of alternative 
connectors between Highway 11
and Highway 130 to alleviate congestion going to Keaau High School and Pahoa;

B. Recommended mitigation measures to ease existing and future congestion.

III. Interconnectivity

A. Evaluate existing street network and recommend interconnectivity system and
standards.

_______________________________________________
Puna-wg-evaluation mailing list
[email protected]
https://www.hcrc.info/mailman/listinfo.cgi/puna-wg-evaluation

_______________________________________________
Puna-wg-evaluation mailing list
[email protected]
https://www.hcrc.info/mailman/listinfo.cgi/puna-wg-evaluation

Reply via email to