Hello

we have several clusters (~250 VMs) attached to one PBS and run daily backups. Each day, there are random timeouts causing some backups to fail.

I've disabled the instant verification process to reduce IO-load on the PBS during that time. The timeouts are gone since then.

Because we do want to have verified backups, we tried out scheduled verification tasks. Then we have the problem, that it takes to long (>1d) to verify all ~250 new snapshots sequentially. 50 parallel verify jobs works well.

My current idea is to write a custom scheduler to make sure that there is a custom amount of verify jobs simultaneously when no backups are running.

Is there a better way I don't see? If I may place a feature request: It would be nice to be able to specify how many verify jobs can work simultaneously.

Thanks!
Sven

_______________________________________________
pve-user mailing list
[email protected]
https://lists.proxmox.com/cgi-bin/mailman/listinfo/pve-user

Reply via email to