On Fri, 3 Dec 2004, Vadim Ogranovich wrote: > What is the reason for seq.Date to require the 'by' argument and not to > default it to 1 in the example below? > > > > seq(from=as.Date("1996-01-01"), to=as.Date("1996-12-01")) > Error in seq.Date(from = as.Date("1996-01-01"), to = > as.Date("1996-12-01")) : > exactly two of `to', `by' and `length.out' / `along.with' must be > specified >
>From a programming aspect, default to 1 what? day? hour? minute? second? microsecond? How would it determine what unit you desired from the [pre]converted value it received as an argument? ---------------------------------------------------------- SIGSIG -- signature too long (core dumped) ______________________________________________ [EMAIL PROTECTED] mailing list https://stat.ethz.ch/mailman/listinfo/r-devel