Jason,
We have installed to similar buildings using #14 tek screws. If you look into their rated pullout strength, you'll find that the large gauges have surprising pullout resistance in purlins. And no interior scaffolding is required.
Allan

Allan Sindelar
Allan@positiveenergysolar.com
NABCEP Certified Photovoltaic Installer
EE98J Journeyman Electrician
Positive Energy, Inc.
3201 Calle Marie
Santa Fe, New Mexico 87507
505 424-1112
www.positiveenergysolar.com


On 12/22/2010 10:01 AM, Jason Szumlanski wrote:

We are working on a contract to put PV on a steel building with a corrugated metal roof. The corrugated metal is not a problem – we have solutions for that. I am wondering about how to best attach to the structural members.

 

For an idea of what we are up against, see: http://www.fafcosolar.com/download/349/IMG_0828.JPG

 

Any suggestions for attachment methods?

 

Jason Szumlanski

Fafco Solar

 

_______________________________________________ List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to