Folks,

Has anyone talked with PG&E about needing (or not needing) a new
Interconnection Agreement when changing out inverter make and model without
increasing the size of the PV generator (number of modules) on a system that
is already interconnected?

Mark Frye
Berkeley Solar Electric Systems
303 Redbud Way
Nevada City,  CA 95959
(530) 401-8024
www.berkeleysolar.com 