Joel,
Use a Magnum PAE system for this. Their MS4448PAE with current firmware has frequency-shift capabilities, to allow control of the Enphases' output when the grid is down. The GT output should not exceed 80% of the Magnum(s) rated output; stacking is allowed here if needed. They still recommend a dump load as a fail-safe, although they're working on a diversion load accessory. I think there's technical material on Magnum's website showing how to do this.
Allan

Allan Sindelar
al...@positiveenergysolar.com
NABCEP Certified Photovoltaic Installer
NABCEP Certified Technical Sales Professional
New Mexico EE98J Journeyman Electrician
Positive Energy, Inc.
3201 Calle Marie
Santa Fe, New Mexico 87507
505 424-1112
www.positiveenergysolar.com


On 4/13/2012 6:07 PM, Joel Davidson wrote:
Wrenches,
I have a customer who wants solar modules and Enphase inverters, but he also wants PV and battery backup power during a grid outage. Are any wrenches doing this? How? Thanks for sharing your knowledge.
Joel Davidson

_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org


_______________________________________________
List sponsored by Home Power magazine

List Address: RE-wrenches@lists.re-wrenches.org

Options & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out participant bios:
www.members.re-wrenches.org

Reply via email to