Hey Wrenches, I planning some AZ-225 tracker installs, and I would like to avoid full excavation for slab/pier type and opt for the drilled pier option. The pier is supposed to be 30-36" diameter and 9.5' deep. This would require a terex reedrill or similar rig. If you know of a firm with that equipment in Wisconsin please contact me off list. Also, one site has a high water table, so any tips on pouring in that environment would be welcomed. Thanks
Ryan Harkins NABCEP Certified Solar PV Installer / Project Manager |
PastedGraphic-3.pdf
Description: Adobe PDF document
Synergy Renewable Systems, LLC PO Box 58 Stoughton, WI 53589 PH: 608-712-7862 ryan.hark...@energycraft.com www.energycraft.com |
_______________________________________________ List sponsored by Home Power magazine
List Address: RE-wrenches@lists.re-wrenches.org Options & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org