Does anyone have an one-line diagram for a grid-tie, battery back-up, for a feed in tariff (in the TVA service area)? I have used a-c coupled in areas where there is net-metering, but TVA requires that there is a separate Generation meter, tied ahead for the service.
William C. Turberville P.E. President ECE Solar Electrical Contracting Enterprises LLC 3080 Stage Post Dr ste 107 Bartlett, TN 38133 901-348-9230 ext 101 phone 901-289-6346 cell 901-348-2192 FAX
_______________________________________________ List sponsored by Home Power magazine List Address: RE-wrenches@lists.re-wrenches.org Change email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out participant bios: www.members.re-wrenches.org