I am working on a rapid shutdown design with an SMA multi-cluster box with
6 x 6048 Sunny Island Inverters, 2 per phase.  I will be utilizing a
Midnite system for some roof top combiners.  Is there a way to shutdown the
Sunny Islands via communication from the Midnite rapid shut down box?  Or
do I need to do shunt-trip breakering?