I checked into the PRI strategy a few months back. An Outback
applications engineer responded that while they were collaborating with
SolarEdge at one time on the method, they don't recommend it any longer
and were going to pull the tech note. The response also questioned
whether SolarEdge still supports that. I'm not sure if that was
referring to hardware capability or was code for "may not warranty
systems doing that." I see the SolarEdge tech note is 4 years old as
well. Might be worth checking into.
- Tom
Tom Ruscitti
Senior Engineer
Taitem Engineering, PC
110 S. Albany Street, Ithaca, NY 14850
Mobile: (607) 220-7022
www.taitem.com
_______________________________________________
List sponsored by Redwood Alliance
List Address: RE-wrenches@lists.re-wrenches.org
Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org
List-Archive:
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html
List rules & etiquette:
www.re-wrenches.org/etiquette.htm
Check out or update participant bios:
www.members.re-wrenches.org