Hello, Can someone tell me the default BTS value for the Schneider MPPT60-150 CC? It’s currently set for -54mv/C I was going to use -5MV/C for the lead acid batteries, but wasn’t sure if the -54 equaled -5.4 due to a fractional conversion, so I left it. The controller did seem to go to float stage quickly, BTW.
Jeremy Rodriguez Solar Installation / Design Expert All Solar, Inc. 1463 M St Penrose Colorado 81240 Sent by Jeremy's iPhone. Sorry for typos and shorthand.
_______________________________________________ List sponsored by Redwood Alliance List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org List-Archive: http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html List rules & etiquette: www.re-wrenches.org/etiquette.htm Check out or update participant bios: www.members.re-wrenches.org