Hi All,

I've been asked to review a GT-BBUS that was installed with a DC to AC
ratio of 2.14.  The system owner is frustrated b/c his 9.2-kW of PV  is
bottlenecked by an 80A MPPT (~4,300W).  The inverter is a XW-5548 so there
is a second bottleneck to overcome even if an additional CC were added.

My inclination is to install a GT inverter for half the array and make a
separate point of connection.  I have considered adding a transfer switch
on the PV conductors to allow the owner to toggle between this new GT
inverter and the existing CC.  I thought that having the option would be of
benefit during extended outages with little sun.

I'd be curious to know if anyone has had to solve a problem similar to this
one and if they were able to find a suitable switch.  To-date, I have not
located a good transfer switch or breaker assembly with handle-tie etc...
Any thoughts are greatly appreciated.

-- 
Matt Sherald
PIMBY Energy, LLC
NABCEP Certified Solar PV Installer®
304-704-5943

www.getpimby.blogspot.com
www.getpimby.com
_______________________________________________
List sponsored by Redwood Alliance

List Address: RE-wrenches@lists.re-wrenches.org

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

List-Archive: 
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html

List rules & etiquette:
www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
www.members.re-wrenches.org

Reply via email to