I have an off grid system with three GS8048A inverters. Every time it switches from generator charging to inverting - at the end of absorption - the lights flicker and a propane boiler in the house goes into fault. I'm using Advanced AGS on the Mate3S.
The loads don't exceed about 6 kW right now. Does anyone know if there's a way to reduce the transfer time? The transition to charging is smooth. I don't understand why it's so clunky transitioning back to inverting. Eric Smiley Project Manager, North Island E: e...@vecoop.ca T: 1-888-386-0116 ext 702 (toll free) C: 250-703-6004 W: viridianenergy.ca
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org