I guess the secondary question is why would anyone use this system anyway in a grid interconnected environment. The only rationale I could see is to have some level of air conditioning when the sun is shining without having to go through the expense of adding a hybrid inverter and batteries. But by the time you install solar panels with a rapid shutdown system, the return on that investment seems terrible considering that much of the solar energy generated will be wasted unless you somehow need maximum cooling from this unit 365 days a year during the daylight hours.
Jason Szumlanski Principal Solar Designer | Florida Solar Design Group NABCEP Certified Solar Professional (PVIP) Florida State Certified Solar Contractor CVC56956 Florida Certified Electrical Contractor EC13013208 On Thu, Jun 19, 2025, 6:15 AM Jason Szumlanski < ja...@floridasolardesigngroup.com> wrote: > I'm getting requests to install 4-6 panels for these mini-splits. I'm > saying no so far, but it got me thinking... What are people doing for rapid > shutdown for these systems? I can't see them being exempt. The manual is > silent on the issue. It just shows a DC isolator from the panels to the > point of connection in the unit. > > Jason Szumlanski > Florida Solar Design Group >
_______________________________________________ List sponsored by Redwood Alliance Pay optional member dues here: http://re-wrenches.org List Address: RE-wrenches@lists.re-wrenches.org Change listserver email address & settings: http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org There are two list archives for searching. When one doesn't work, try the other: https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/ http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org List rules & etiquette: http://www.re-wrenches.org/etiquette.htm Check out or update participant bios: http://www.members.re-wrenches.org