Hi, On Fri, Apr 3, 2009 at 2:06 PM, Jeremy Easton-Marks <[email protected]> wrote: > When are we proposing to make these changes? This release? A future point > release? Or River 3.X?
I'm thinking about cutting AR2 fairly soon as the test integration that I was worried about earlier has been progressing very well. After that I'd propose that we do the package mapping to org.apache.river and upgrade to Java 5. The release numbering should bump to Apache River 3.0 to indicate these changes. > On a completely different point. What are we doing about documentation, > examples, and other things of that nature? We are looking forward to contributions from interested people. :-) BR, Jukka Zitting
