Many reefers had steel "stages" in the bunker which allowed partial icing.
The last picture of the workers on the car roof shows the Hutchins steel roofs I offered some time ago (which I still have a couple available). Pieter E. Roos --- On Thu, 3/14/13, Bill Lane <[email protected]> wrote: There are a number of ways to ice a reefer. Short of a full platform facility I would liken them to be more of icing a single or a few reefers in an emergency situation. I have wondered about the sliding of a 200+ pound block of ice into the bunker with possibly an 8 foot drop. What stops it from going right through the floor to the ground? (:->) That has to be 1 strong floor to continually take that abuse. Thank You, Bill Lane Attachment(s) from Bill Lane 3 of 3 Photo(s) Icing 6.jpg Icing 5.jpg Icing 7.jpg _
